Proven Track Record

Past
Performance

USACE

Federal MATOC Awardee

1M+

Cubic Yards Moved

100%

On-Time Delivery

0

Environmental Violations

220+

Combined Years Experience

Trusted By

Federal, State, and Municipal Clients

Every project below was delivered for the agencies represented here.

Jupiter Inlet District seal

Jupiter Inlet District

3 Projects
Palm Beach County seal

Palm Beach County

1 Project
Town of Palm Beach Shores seal

Town of Palm Beach Shores

1 Project
Martin County seal

Martin County

1 Project
Town of Longboat Key seal

Town of Longboat Key

1 Project
Charlotte County seal

Charlotte County

1 Project
Village of Royal Palm Beach seal

Village of Royal Palm Beach

1 Project
USACE Jacksonville District seal

USACE Jacksonville District

1 Project · MATOC W912EP-25-D-0013
Florida DEP seal

FDEP

Permitting Authority Across All Projects

Project Portfolio

2026 01 Jupiter Inlet sand trap dredging
Jupiter Inlet District Palm Beach County, FL

Jupiter Inlet Sand Trap Dredging

Recurring sand trap maintenance for the Jupiter Inlet District. 24/7 hydraulic cutterhead operations removed 161,536 CY for downdrift beach nourishment south of the inlet.

  • 161,536Cubic Yards
  • 2026Year
  • CutterheadMethod
  • 24/7Operations
Project 1 of 10
2025 02 Lake Worth Inlet flood shoal dredging at Peanut Island
Town of Palm Beach Shores Palm Beach County, FL

Lake Worth Inlet Flood Shoal & Peanut Island

Hydraulic dredging north of Peanut Island with mitigation hole fill operations. Continuous turbidity monitoring protected vital marine habitats throughout the Lake Worth Inlet system.

  • 70,700Cubic Yards
  • 2025Year
  • HydraulicMethod
  • HabitatMitigation
Project 2 of 10
2025 03 South Lake Worth Inlet sand trap dredging
Palm Beach County ERM Boynton Inlet, FL

South Lake Worth Inlet Sand Trap

Sand trap maintenance dredging at South Lake Worth Inlet, managed through Palm Beach County Environmental Resources Management. Beach-compatible material placed for nearshore nourishment.

  • ~63,000Cubic Yards
  • 2025Year
  • HydraulicMethod
  • NearshorePlacement
Project 3 of 10
2024 – 2025 04 Longboat Key beach renourishment
Town of Longboat Key Sarasota County, FL

Longboat Key Interim Beach Renourishment

$2.8M interim beach renourishment along Gulfside Road on Florida's Gulf Coast. Hydraulic dredging and sand placement restored critically eroded shoreline as part of the town's coastal resilience program.

  • 70,000Cubic Yards
  • $2.8MContract
  • HydraulicMethod
  • Gulf CoastRegion
Project 4 of 10
2024 05 Bathtub Beach and Sailfish Point renourishment
Martin County St. Lucie Inlet, FL

Bathtub Beach & Sailfish Point Renourishment

The largest single project in AGDM company history at 268,000 CY. Sand was dredged from the St. Lucie Inlet, Sailfish Point Marina channel, federal navigation channel, and impoundment basin and placed along Bathtub Beach and Sailfish Point shoreline.

  • 268,080Cubic Yards
  • 2024Year
  • Multi-SourceBorrow Areas
  • LargestCompany History
Project 5 of 10
2023 06 Jupiter Inlet sand trap dredging 2023
Jupiter Inlet District Palm Beach County, FL

Jupiter Inlet Sand Trap Dredging

Recurring hydraulic cutterhead dredging of the Jupiter Inlet sand trap. Beach-quality material placed for downdrift nourishment south of the inlet.

  • 100,000+Cubic Yards
  • 2023Year
  • CutterheadMethod
  • RecurringContract
Project 6 of 10
2023 07 Royal Palm Beach canal dredging and stormwater pond
Village of Royal Palm Beach Palm Beach County, FL

Royal Palm Beach Canal Muck Removal

Converted a temporary dredge management area into a permanent stormwater retention pond as part of project scope. Hydraulic swing-ladder dredging pumped canal muck as slurry into geotextile dewatering bags for on-site drying and truck haul-off.

  • 22,000Cubic Yards
  • 2023Year
  • Swing-LadderMethod
  • PondConversion
Project 7 of 10
2021 – 2022 08 Stump Pass maintenance dredging and beach nourishment
Charlotte County Stump Pass, FL

Stump Pass Maintenance & Beach Nourishment

24/7 operations through turtle nesting season with zero environmental incidents. $2.2M Charlotte County maintenance contract straightened the navigation channel to 5-foot depth, with beach-quality sand placed along Stump Pass Beach State Park and northern Knight Island.

  • 200,000Cubic Yards
  • $2.2MContract
  • 24/7Operations
  • ZeroIncidents
Project 8 of 10
2021 09 Jupiter Inlet sand trap dredging 2021
Jupiter Inlet District Palm Beach County, FL

Jupiter Inlet Sand Trap Dredging

Hydraulic cutterhead dredging with computer-tracked positioning to protect adjacent seagrass habitat. Beach-compatible material placed for downdrift nourishment south of the inlet.

  • 100,000+Cubic Yards
  • 2021Year
  • CutterheadMethod
  • SeagrassAvoidance
Project 9 of 10
2020 – 2021 10 USACE Crossroads ICW maintenance dredging
USACE Jacksonville District St. Lucie & Jupiter Inlets, FL

Crossroads ICW Maintenance Dredging

Intracoastal Waterway O&M dredging for USACE Jacksonville District under a $2.7M small business set-aside MATOC. Approximately 48,000 CY from the Crossroads area at St. Lucie Inlet, plus approximately 95,000 CY from Jupiter Inlet with beach placement. 24/7 continuous operations with computer-tracked dredge positioning for seagrass avoidance.

  • ~143,000Cubic Yards
  • $2.7MMATOC
  • FederalUSACE
  • 24/7Operations
Project 10 of 10

By the Numbers

1.2M+

Cubic Yards Delivered

6

Years of Continuous Operations

8

Government Agencies Served

The Track Record Is The Pitch.